Author Archives: Newbridge Kildare Municipal Office

Road resurfacing works – R415 Allenwood to Kilmeague Road -Monday 25th June to Friday 6th July.

Road resurfacing works will take place along the R415 from Allenwood Cross to the bridge of the Travellers Rest Public House between the 25/06/18 to 06/07/18. It will be necessary to close this section of the R415 to through traffic for specific times over this two week period to carry out the road resurfacing works safely. […]
Posted in Current Alerts | Comments closed

Roadworks-Powerstation Rd, Allenwood-21/06/18

The Kildare-Newbridge MD Office are scheduled to carry out road re-surfacing works on the L1020 Allenwood Powerstation Rd on the 20th of June between 08:30 and 17:00 hrs. The roadworks will take place between Allenwood GAA grounds and the junction of the L1020/R403. This section of the road will be closed during the works. All local traffic will be accommodated during the […]
Posted in Current Alerts | Comments closed

Roadworks-Feighcullen Cross-20/06/18

The Kildare-Newbridge MD Office are scheduled to carry out road re-surfacing works on the L7005 Feighcullen Rd on the 20th of June between 08:30 and 17:00 hrs. The roadworks will take place between Feighcullen House and the junction of the Feighcullen/Allen Rd. This section of the road will be closed during the works. A diversion route for traffic approaching from […]
Posted in Current Alerts | Comments closed

Standhouse Rd, Newbridge-Roadworks-19/06/18

The Kildare-Newbridge MD Office are scheduled to carry out road re-surfacing works on the L7037 Standhouse Rd on the 19th of June. The roadworks will take place between the TRI Equestrian Stores and The Seven Springs Housing Estate. The Standhouse Rd will be closed during the works. A diversion route will operate via the R445 Ballymany Rd during the works. However, […]
Posted in Current Alerts | Comments closed

Night Time Roadworks at Lumville House between 13/06/18 to 15/06/18

The Kildare-Newbridge MD Office are scheduled to carry out night time road re-surfacing works at the junction of the Green Rd (R413)/Kilcullen Rd (L7042) between the 13/06/18 to 15/06/18. These works will be carried between 19:00 hrs. and 06:00 hrs. There will be temporary traffic management measures operating at the junction during these road works. These temporary traffic management measures […]
Posted in Current Alerts | Comments closed

Night Time Roadworks at the Curragh Camp between 11/06/18 to 15/06/18

The Kildare-Newbridge MD Office are scheduled to carry out road surfacing works in the Curragh Camp between the 11/06/18 to 15/06/18. The works will be carried between the Cattle Grid at McDonagh Pitch and Putt Club to the Curragh Camp Church. In order to facilitate these works, a road closure has been obtained for these works and […]
Posted in Current Alerts | Comments closed
  • Winter Services and Advice

    Translate this page

    Social Networking
    Follow us on Facebook
    Sign up to our RSS Feeds
    Follow us on Twitter